
The Company
Production cycle optimization with MRP II and flexible scheduling
Management Office
The management office uses the MRP II (Material requirements Planning) system and production scheduling to guarantee an organized and, at the same time, flexible planning of the full production cycle, in order to meet the customer’s demands.
The facility is totally computerized: there are 30 terminal points linked through an optical fiber network.


MRP II
Manufacturing Resource Planning
The M.R.P. II is a method of resource planning used by Silcon Plastic Ltd: it’s based on a management computerized system which provides a feasible and realistic production plan.
The M.R.P. II is the evolution of the old M.R.P., from which we get information regarding the production life cycles, production orders and manufacturing bills of materials (B.O.M.). The database enables a finite capacity analysis which is necessary for production’s planning and raw materials’ requirement, and it also takes into consideration the workforce and the machinery availability.
Certifications
In 2004, confirming its commitment to rigorous production cycle management and ensuring the high quality of its products, Silcon Plastic srl obtained UNI EN ISO 9001 certification. Since 2023, the company has also been UNI EN ISO 14001 certified, guaranteeing its attention to environmental sustainability and responsible resource management.



